
Construction on the "lot" is coming along.
My time estimates may have been a bit optimistic. I may not have accounted for having a full time job at this time as well, which severely limits my available time to work on the place. There is only a bit of shingling left before we can start working on the foundation and siding.
(Photos: Views from the roof of the building, a shot from my car as I was heading home one evening, Shingling... a lot of angles...)
